KCLS RFQ: Electrical engineering design for North Bend Library backup power (solar, batteries, generator)
King County Library System is seeking qualified electrical engineering vendors to design a backup power system for the North Bend Library. The system must support lighting, HVAC, and core operations for up to 36 hours during utility outages, using solar panels and batteries, and a generator if required. The design should include automatic transfer from utility power during outages.
Source
Dates
Eligibility
Keywords
Supporting Links
Documents
Similar Opportunities
-
Electric Power Resiliency for Building 235
Defense Logistics Agency
-
Outage Management System RFP for Electricity Generation and Transmission Utilities
Grant County Public Utility District
-
Starkville Utilities Outage Management System (OMS) RFP
City Of Starkville Construction
-
Town of Concrete 2026 RFQ — Architects, Engineers, Landscape Architects & Consultants
Town Of Concrete
-
Subcontract: Utility & Backup Power Independence - Mission Control Station (Colorado)
Subcontracts - Co
Find tens of thousands more opportunities — free
Scout accounts are free. Sign up to browse the full funding database, unlock the solicitation links and documents for this opportunity, and see how well each one fits your organization.
-
Tens of thousands of funding opportunities
Search and filter every grant and solicitation in Scout — all free, no credit card required.
-
Instant Fit Analysis
Let our grant expert AI score how well this opportunity aligns with your organization, strengths, gaps, and how to improve your chances of winning funding.
-
Source links & full documents
Jump straight to the solicitation and download every attachment.
-
Save opportunities & track deadlines
Keep the opportunities that fit in one place and stay ahead of every due date.
Already have an account? Sign In
Trusted by 500+ Happy Customers