contract 140FC225Q0054
Z--MO NEOSHO NFH POND 20 PUMP STATION
Funding to install a permanent water pumping system that transfers water between Pond 20 and the Sturgeon Building at the Neosho National Fish Hatchery (NFH). The project’s goal is to provide a reliable, long-term water supply to support sturgeon operations. Work will likely include pump installation, piping between the pond and building, electrical power and control connections, integration w…
Installation of a permanent pumping system between Pond 20 and the Sturgeon Building at Neosho NFH.
Funding Source
Agency: U.s. Fish And Wildlife Service
Supporting links
Secure Grant Funding 10x Faster
Scout delivers AI-powered grant writing paired with experts that's faster, more affordable, and built to win.
Already have an account? Sign In
Trusted by 500+ Happy Customers