This opportunity is no longer accepting applications.
contract
JBSA Golf Cart/Pedestrian PreFabricated Bridges
- Opportunity: RFQ FA301625Q0246 to remove and replace two bridges at Joint Base San Antonio:
- Site A: Hole 18 Golf Cart Bridge (B490), JBSA Lackland
- Site B: Pedestrian Bridge (B8160), JBSA Chapman Training Annex
- Scope: Demolition and installation of prefabricated, structurally sound bridges to safely carry pedestrians and golf carts; must meet ADA requirements.…
Source
Agency: Department Of The Air Force
Dates
Response Deadline: September 23, 2025
Keywords
prefabricated bridge
pedestrian bridge replacement
ADA accessibility compliance
transportation infrastructure grant
safety improvements
military installation infrastructure
golf cart bridge
bridge construction funding
federal infrastructure grant
Joint Base San Antonio
Supporting Links
Sign up to unlock the source links
Sign up freeDocuments
Sign up to unlock the solicitation documents
Sign up freeSimilar Opportunities
Get the full picture on this opportunity
Create a free Scout account to unlock everything you need to decide fast and win the grant.
-
Instant Fit Analysis
Let our grant expert AI score how well this opportunity aligns with your organization, strengths, gaps, and how to improve your chances of winning funding.
-
Deep agency & funder detail
Program context, sub-agency structure, and a full eligibility breakdown.
-
Source links & full documents
Jump straight to the solicitation and download every attachment.
-
Similar opportunities
Discover related funding matched to your work.
Already have an account? Sign In
Trusted by 500+ Happy Customers