FCE130309 4610 Wasatch Hollow Outfall Redesign - CONST
This opportunity is for general contracting services to redesign and upgrade the Wasatch Hollow/Wasatch Hollow detention pond outfall system in Salt Lake City, UT. The work includes modifying the existing outlet and overflow structure, installing new overflow and outlet storm drain piping, routing and connecting the system to the existing storm network, and improving internal outlet components…
Source
Dates
Keywords
Supporting Links
Documents
Similar Opportunities
-
HCID No. 14 Dunham Pointe, Detention/Amenity Lake M Storm Sewer Facilities and Detention Pond
Harris County Id No. 14 Construction / Engineering
-
IFB 27-002 Pond C Retrofit
Town Of Warrenton
-
RFQ 711024: Rehabilitation of Storm Water Management Detention Facilities
County Of Loudoun
-
MRF Paving and Stormwater Improvements
Public Works
-
Guilford Stormwater Pond Repair and Water and Sewer Plans
Howard County
Find tens of thousands more opportunities — free
Scout accounts are free. Sign up to browse the full funding database, unlock the solicitation links and documents for this opportunity, and see how well each one fits your organization.
-
Tens of thousands of funding opportunities
Search and filter every grant and solicitation in Scout — all free, no credit card required.
-
Instant Fit Analysis
Let our grant expert AI score how well this opportunity aligns with your organization, strengths, gaps, and how to improve your chances of winning funding.
-
Source links & full documents
Jump straight to the solicitation and download every attachment.
-
Save opportunities & track deadlines
Keep the opportunities that fit in one place and stay ahead of every due date.
Already have an account? Sign In
Trusted by 500+ Happy Customers