FTG247 Replace UPS at IDT1
Opportunity: Power system upgrade for a HEMP-shielded equipment room connected to the Fort Greely Power Plant (USACE)
Purpose
- Replace and modernize Uninterruptible Power Systems (UPS) to improve reliability, redundancy, and monitoring for mission-critical equipment.
Key work items
- Replace existing 80 kVA UPS with distributed, redundant 75 kVA UPS …
THE PURPOSE OF THIS PROJECT IS TO REPLACE THE EXISTING 80KVA UNINTERRUPTABLE POWER SYSTEMS (UPSS) WITH DISTRIBUTED REDUNDANT 75 KILOVOLT-AMPERE (KVA) UPSS. NEW UPS PANELBOARDS WILL BE ADDED TO ALLOW FOR REDUNDANT RECEPTACLES FOR ALL THE MISSION EQUIPMENT WITHIN THE HIGH-ALTITUDE ELECTROMAGNETIC …