Eswtp Residuals Handling Improvements Phase Ii
Background The Dallas Water Utilities is issuing this contract for the ESWTP Residuals Handling Improvements Phase II, aimed at enhancing the operational efficiency and safety of the East Side Water Treatment Plant located at 405 Long Creek Road, Sunnyvale, Texas.
The project is part of a broader initiative to improve water treatment processes and infrastructure.
Work Details …
The project consists of the construction of a new residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable frequency drives, a new electrical building with a motor control center (MCC), HVAC improvements, and replacement of the site transformer. Additio…
Funding Source
Dates
Supporting links
Documents
- 4-Bidders Affidavit.docx
- 1-Acknowledgement of Addendum.docx
- 18-26 019 Bid Proposal Spreadsheet.xls
- 17-26 019 DRAWINGS.pdf
- 16-26 019 SPECIFICATIONS VOLUME 3 OF 3.pdf
- 3-Bid Proposal Submittal Form.pdf
- 14-26 019 SPECIFICATIONS VOLUME 1 OF 3.pdf
- 11-BEH-FRM-607.SAW.pdf
- 13-BEH-FRM-610.SAW.pdf
- 12-BEH-FRM-609.SAW.pdf
Secure Grant Funding 10x Faster
Scout delivers AI-powered grant writing paired with experts that's faster, more affordable, and built to win.
Already have an account? Sign In
Trusted by 500+ Happy Customers