Substation 10 Transformer Upgrade
This is a facilities engineering and construction project to upgrade Substation 10’s 69/15 kV, 18 MVA transformer and associated high-voltage switchgear infrastructure. The work includes removing the existing transformer and breaker structures, relocating and replacing key components (including a 15 kV breaker and steel switch stands), and installing a new transformer with an oil containment s…
Source
Dates
Keywords
Supporting Links
Documents
Similar Opportunities
-
Supply Substation Shaped Steel Structures - QTEP Monument Hill Switchyard
Grant County Public Utility District
-
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
Iowa State University
-
PRE-QUALIFICATION-Purchase (6ea) 20/26/34MVA, 115/60-12.47Y/7.2kV Substation Transformers
Palo Alto Utilities
-
Revere Substation Siemens VCB Procurement
Manitowoc Public Utilities
-
Medium Voltage Transformer Replacement
Wisconsin Department Of Administration
Find tens of thousands more opportunities — free
Scout accounts are free. Sign up to browse the full funding database, unlock the solicitation links and documents for this opportunity, and see how well each one fits your organization.
-
Tens of thousands of funding opportunities
Search and filter every grant and solicitation in Scout — all free, no credit card required.
-
Instant Fit Analysis
Let our grant expert AI score how well this opportunity aligns with your organization, strengths, gaps, and how to improve your chances of winning funding.
-
Source links & full documents
Jump straight to the solicitation and download every attachment.
-
Save opportunities & track deadlines
Keep the opportunities that fit in one place and stay ahead of every due date.
Already have an account? Sign In
Trusted by 500+ Happy Customers