HMA Surface Removal and Overlay with Shoulder Improvements on CH 17 from Will County Line to E 9000 N Road
This opportunity supports roadway construction work on CH 17, including removal of the existing asphalt surface, installation of a new asphalt overlay, and associated shoulder improvements along the segment from the Will County line to E 9000 N Road. It is aimed at improving pavement conditions and roadside safety/capacity through standard highway resurfacing and shoulder upgrades.
Source
Dates
Eligibility
Keywords
Supporting Links
Documents
Similar Opportunities
-
SR 869/Sawgrass Expressway Widening and Corridor Improvements from Sunrise Blvd to Oakland Park Blvd (FPID No 437155-1-52-01)
Florida Department Of Transportation
-
OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Federal Highway Administration
-
612193 ANDOVER FAP No. HIP(NGB)-0934(003) Bridge Preservation, A-09-022, I-93 over Merrimack River
Massachusetts Department Of Transportation
-
Stockton Lake Project Pavement Replacement, Demolition and Installation of New Pavement and Aggregate Base
Department of the Army
-
CRA Front Beach Road Segment 4.1 Design-Build
City Of Panama City Beach
Find tens of thousands more opportunities — free
Scout accounts are free. Sign up to browse the full funding database, unlock the solicitation links and documents for this opportunity, and see how well each one fits your organization.
-
Tens of thousands of funding opportunities
Search and filter every grant and solicitation in Scout — all free, no credit card required.
-
Instant Fit Analysis
Let our grant expert AI score how well this opportunity aligns with your organization, strengths, gaps, and how to improve your chances of winning funding.
-
Source links & full documents
Jump straight to the solicitation and download every attachment.
-
Save opportunities & track deadlines
Keep the opportunities that fit in one place and stay ahead of every due date.
Already have an account? Sign In
Trusted by 500+ Happy Customers