Arabia Street and Dr. Carreon Blvd. Traffic Signal and Sidewalk Improvements - Phase I
This opportunity supports Phase I upgrades at the intersection of Arabia Street and Dr. Carreon Boulevard, including installation of a fully actuated traffic signal with communication and detection systems. The scope also includes reconstructing curb ramps, replacing sidewalks and a driveway segment, updating cross gutters, and improving road signing and striping. It is a transportation infras…
Source
Dates
Keywords
Supporting Links
Documents
Similar Opportunities
-
SR 869/Sawgrass Expressway Widening and Corridor Improvements from Sunrise Blvd to Oakland Park Blvd (FPID No 437155-1-52-01)
Florida Department Of Transportation
-
CRA Front Beach Road Segment 4.1 Design-Build
City Of Panama City Beach
-
26-082Q - Safe Streets 4 All Safety Action Plan Study
City of Boynton Beach
-
2026 Tribal Transportation Program Safety Fund
DOT Federal Highway Administration
-
84126P0001-Develop, Deploy, Support and Maintain Existing and Future Citywide Transit Signal Priority (TSP)
Nyc Department Of Transportation
Find tens of thousands more opportunities — free
Scout accounts are free. Sign up to browse the full funding database, unlock the solicitation links and documents for this opportunity, and see how well each one fits your organization.
-
Tens of thousands of funding opportunities
Search and filter every grant and solicitation in Scout — all free, no credit card required.
-
Instant Fit Analysis
Let our grant expert AI score how well this opportunity aligns with your organization, strengths, gaps, and how to improve your chances of winning funding.
-
Source links & full documents
Jump straight to the solicitation and download every attachment.
-
Save opportunities & track deadlines
Keep the opportunities that fit in one place and stay ahead of every due date.
Already have an account? Sign In
Trusted by 500+ Happy Customers